Monthly Archives: August 2025

How Long Does It Take to Get a BOXABL ADU Installed in Utah?

For Utah homeowners seeking a fast, modern, and efficient housing solution, BOXABL ADUs are rapidly gaining popularity. These innovative, modular, foldable units are designed for quick setup, offering a streamlined alternative to traditional home construction. But how long does BOXABL ADU installation actually take in Utah?

Here’s a breakdown of the process, including average timelines and key factors that can impact your project, from delivery to final utility hookups.

BOXABL Installation Process

What Is a BOXABL ADU?

Before we dive into timing, let’s clarify what a BOXABL ADU is. These are compact, prefabricated housing units that arrive folded and are quickly assembled on-site. Engineered for energy efficiency, durability, and adaptability, BOXABL units are often used for Accessory Dwelling Units (ADUs), guest houses, or even primary residences.

Unlike traditional homes that take months—or even years—to build, BOXABL ADUs are designed for speed. But installation still requires planning and coordination.

Average Timeline for a BOXABL ADU Installation

While each project is unique, here’s a general timeline you can expect for BOXABL ADU installation in Utah:

Ordering & Coordination (2–4 Weeks)

Once you decide to move forward, you’ll place your order and begin working with your installer to plan logistics. This includes selecting your Certified BOXABL Installer (Tuscany Builders), discussing site location, and reviewing local regulations.

Permitting & Site Preparation (4–8 Weeks)

Permitting timelines vary based on your municipality. In Utah, zoning laws differ from county to county, and some areas may require additional approvals for ADUs. Meanwhile, your contractor will handle land grading, utility trenching, and foundation work (slab, crawl space, or basement).

Keep in mind that site prep and permits are often the longest phase of the project, particularly if you’re in a city with stricter zoning laws.

Delivery & Setup (1–3 Days)

Once permits are secured and the foundation is ready, the BOXABL unit is delivered to your property—folded and compact. The actual unfolding and assembly can happen in as little as a day or two, depending on weather and access to the site.

Utility Connections & Final Inspections (1–2 Weeks)

After setup, plumbing, electrical, HVAC, and sewer lines must be connected and inspected. Tuscany Builders ensures all utility hookups are completed safely and up to code, scheduling inspections as needed to meet Utah’s building standards.

Total Estimated Timeline: 6–12 Weeks

Compared to the average 8–14 months required for traditional home construction, this is an impressively short build window.

Utah-Specific Factors That Can Impact Your Timeline

While BOXABL ADUs are designed for rapid installation, a few local factors can influence your timeline in Utah:

    • Weather: Heavy snowfall in winter or spring runoff can delay site prep and inspections.
    • Zoning Laws: Each city or county has its own zoning rules for ADUs. Some may limit placement or require extra paperwork.
    • Site Conditions: Uneven terrain, rocky soil, or remote locations may extend prep time.
    • Utility Access: If your site is far from existing utility lines, it may take longer to complete connections.

Working with a Certified BOXABL Installer like Tuscany Builders helps you navigate these challenges efficiently.

How BOXABL Installation Compares to Traditional Construction

Feature BOXABL Installation Traditional Home Build
Timeline 6–12 weeks 8–14 months
Cost Lower overall Higher upfront and labor
Weather Delays Minimal Common
Customization Limited but growing Extensive
Permit Complexity ADU-specific Standard residential

While traditional homes offer more design flexibility, BOXABL units are ideal for homeowners who value speed, affordability, and efficiency, especially when paired with the right builder.

Trust Tuscany Builders for Your BOXABL Project

Tuscany Builders is a Certified BOXABL Installer with deep expertise in Utah site preparation, zoning compliance, and ADU installation. From your first consultation to the final utility hookup, we handle every step so your installation stays on schedule and stress-free.

Ready to Build Faster?

If you’re considering a BOXABL ADU installation in Utah, now is the time to act. Contact Tuscany Builders to schedule a free consultation and learn how quickly you can start living in a smart, sustainable home designed for Utah’s landscape and lifestyle.